Skip to main content
Brickato logoBrickato
BlogContact
Sign inBook a demo
Brickato logoBrickato

Build Smarter, Brick by Brick.

LinkedInFacebook

Product

AssistantTasksSmart SheetsWorkflowsLibraryVaultProducts

Platform

Document IntelligenceSecurityIntegrationsCompare

Company

AboutBlogContact sales

Legal

Privacy PolicyTerms of Service
Are you an AI agent? See this page in plain text

© 2026 Brickato. All rights reserved.

Intelligent construction platform

Build smarter,
brick by brick.

Win bids with fewer surprises. Run projects with less rework. Every answer cites the source, so your team can sign off with confidence.

Book a demo
What is the concrete strength spec for Level 3? Level 3 requires C30/37 concrete per Spec §4.2, with 28-day cure verification before pour.
What is the concrete strength spec for Level 3?
Level 3 requires C30/37 concrete per , with 28-day cure verification before pour.

Answer grounded in your uploaded documents

Spec §4.2Structural_Spec.pdf · p. 47

Concrete strength - Level 3

All Level 3 slabs shall achieve minimum characteristic strength C30/37 at 28 days.

Jump to section

  • The Platform·
  • Lifecycle·
  • Field notes·
  • Get started

The expensive problems start long before they reach the site.

Scope gaps

The drawing was revised. The bill of quantities was not.

Budget risk

A requirement that appears in the spec never made it into the pricing.

Coordination and schedule

Two critical activities collide, and nobody sees it until execution starts.

Brickato finds these gaps in time, before they become mistakes, delays and cost you never budgeted for.

/ 02 PROACTIVE, IN PRACTICE

One revised drawing. Nobody asked a question.

Here is how it looks from inside the product. The team uploaded a revision and carried on working. Brickato ran the cross-check on its own.

  1. 09:14A REVISION ARRIVES

    Drawing A-301 goes from Rev B to Rev C

    The architect widened the retaining wall along axis 12. It lands in the project like any other file.

  2. 09:14THE CROSS-CHECK RUNS

    Brickato compares it against the BOQ and the contract

    The bill of quantities still prices the Rev B wall. The contract puts design changes after award on the contractor.

  3. 09:15SOMEONE OWNS IT

    A finding, its sources, and a task

    One person approves the finding. It becomes an assignment carrying the drawing, the BOQ row and the clause.

Product illustration of a finding with citations and an approve action

Watching this project

2 checks · always on
  • Drawing revision cross-checkrunning · A-301 Rev C09:14
  • Contract obligation coverageclear08:02

The BOQ still prices the Rev B retaining wall A-301 Rev C · axis 12BOQ 02.032 · row 27CONTRACT §14.3

The revised wall adds roughly 38 m³ of concrete that is not in the priced quantities. Under §14.3 a post-award design change is carried by the contractor unless it is raised as a change order.

estimated exposure ₪47,000confidence 0.94 · quantities recomputed from the revision
Approve and assignOpen the drawingDismiss

The BOQ still prices the Rev B retaining wall A-301 Rev C · axis 12BOQ 02.032 · row 27CONTRACT §14.3

estimated exposure ₪47,000
Approve and assign

Proactive is only worth anything if the system is right.

Three things make every finding checkable in seconds, by the person whose name is on the decision.

PARSE

Every page becomes typed regions

Quantities, clauses and drawing callouts, each boxed on the page and scored for confidence. The reason behind the score is a hover away.

CITE

Citations point to rectangles, not page numbers

Click a citation and the exact source region opens, drawn on the original document. Never "see page 212" and good luck.

RATIFY

A person signs off before anything grounds a decision

Every finding moves from proposed to approved, the approver is named, and a correction reaches everything that cited the same source.

Security

Your data,
yours.

  • AES-256 encryption

    At rest & in transit (TLS 1.3).

  • Role-based access

    Per-project permissions.

Bring a live tender to the demo.

We load your own package on the call and you interrogate it yourself. If the findings do not hold up, you will know inside twenty minutes.

Book a demoContact sales

/ 03 The Platform

One platform for the whole project,
from tender day to handover.

Not a generic chat. Brickato is built around tenders, contracts, BOQs and drawings. Every module reads the same documents, so a gap caught in one of them shows up in the rest.

Assistant

Live

Ask in Hebrew or English. Answers cite the tender, the contract, the BOQ, down to the row.

Tasks

Live

A finding becomes someone's assignment and it carries its citations with it.

Smart Sheets

Soon

Eight subcontractor offers become one comparison grid, priced against your reference catalog.

Workflows

Soon

Saved checks that run on every new document, so the cross-check happens without anyone starting it.

Library

Soon

Price catalogs and standards as versioned reference data, cited like everything else.

Vault

Live

Lessons from finished projects, ratified by your team, ground the next tender.

Soon
BrickatoAssistantOrganization

Bid comparison · Structural works

8 offers · 156 extracted cells
SubcontractorTotalConcrete ₪/m³WarrantyExclusions
A.B. Structural Ltd12,410,00041860 monone
Gal-Beton Ltd11,890,000322 ↓23%36 mop.4 §2
Levi Bros. Engineering13,150,00045560 mop.6 §4.1
priced against the Dekel catalog v2026.2142 / 156 cells verified1 anomaly flagged

Eight offers, one grid. Every cell is an extraction with a source region behind it, so clicking a number opens the offer at the row it came from. The flagged rate sits 23 percent under the reference catalog, which usually means something was left out of the scope.

/ 06 Lifecycle

From tender
to handover.

Most tools stop at one phase. Brickato connects tender, execution, and closeout - so context does not die when the team changes.

01

Discover & Plan

Tenders, BOQs, Bids

Review a 500-page tender in minutes. Compare specs, catch mismatches, and de-risk bid day - before submission.

02

Execute & Monitor

Contracts, RFIs, Plans

Surface risk clauses, track RFIs, and catch plan-vs-spec conflicts while there is still time to fix them.

03

Complete & Handover

Handover, Knowledge, KPIs

Turn every handover into institutional memory - smoother client sign-off and a stronger next bid.

/ 08 Field notes

From the site and the source.

All articles
Earlier and revised tender documents being compared before changes flow into a construction estimate.

How to Review Construction Tender Addenda

BBrickato Editorial Team·Aug 31, 2026
Compare Subcontractor Bids Without Missing Exclusions

Compare Subcontractor Bids Without Missing Exclusions

BBrickato Editorial Team·Aug 9, 2026
The Missing Steel Beam That Halted a Project

The Missing Steel Beam That Halted a Project

BBrickato Editorial Team·Mar 24, 2026